⚡ Free Instant Home Electrical Assessment — Get Your Report
Killer Electric
Killer Electric
Southeast Michigan
Panel Upgrade (100A → 200A) in Chelsea
Chelsea, MI

Panel Upgrade (100A → 200A)
Chelsea, Michigan

Upgrade your 100A panel to 200A — the space you need for EVs, saunas, and modern loads. Killer Electric serves Chelsea and all of Washtenaw County.

Panel Upgrade (100A → 200A)Chelsea

A 100A panel was sized for a different era. Today's electric vehicles, heat pumps, and smart appliances demand more. We upgrade your panel to 200A — permit-pulled, inspection-coordinated, and future-ready.

Chelsea's small-town character comes with a charming older housing stock—many homes here still have the original electrical systems installed decades ago.

What's included

  • 200A panel replacement with clean circuit labeling
  • Load planning for current and future needs
  • Grounding and bonding corrections included
  • Permit and inspection coordination with your local AHJ
  • EV and high-draw circuit readiness

Why Killer Electric in Chelsea

  • Licensed & insured Michigan electricians
  • Familiar with Chelsea inspectors and local AHJ requirements
  • Upfront scope and pricing — no surprise add-ons
  • Fast response — same or next-day for most projects
  • Serving Chelsea Downtown, South Main area

Pricing: Starts at $2,800

Get a Fast Estimate — Chelsea

We serve Chelsea, Chelsea Downtown, South Main area, and all of Washtenaw County. Fill out the form and we'll get back to you fast — usually same day.

Prefer to text? (734) 274-9106 · office@killerelectric.com